BCA Checklist for Fast Bank Approval: 7 Mistakes That Delay Financing
- ENGIPRO
- Jul 19, 2025
- 2 min read
You’ve negotiated a great rate; your appraisal checks out; but if the bank’s underwriter finds holes in your Building Condition Assessment, the entire deal stalls. Re-inspections, and legal reviews add days—or weeks—of holding costs. Below is a bank-optimized checklist (based on CMHC and Royal Bank templates), seven pitfalls that kill momentum, and ENGIPRO’s strategy for zero re-submissions.

Quick-View BCA Checklist
Must-Have Item | Why Lenders Care |
Engineer (P.Eng) seal + permit | Confirms professional liability insurance |
Building envelope risk note | Flags potential water ingress or façade issues |
Immediate repair cost (0–12 mo) | Triggers risk review for near-term capital needs |
Photo log cross-referenced to plan | Evidence for credit committee |
Capital plan (5 yrs) | Forecasts reserve adequacy |
Replacement-cost summary | Checks insurance coverage |
Signed reliance letter | Gives lender legal reliance rights |
See BC Financial Services Authority’s lender regulatory guidance on reliance letters in engineering reports.

Seven Pitfalls That Stall Funding
# | Pitfall | Typical Delay |
1 | No reliance letter | Legal review adds 3–5 days |
2 | No capital cost breakdown | Underwriter issues RFI; +2 days |
3 | Roof condition unverified | Lender questions envelope risk; +1 week |
4 | Incomplete photo log | Lender requests re-inspection |
5 | Cost table lacks escalation | Reserve planning flagged; reviewer follows up; +2 days |
6 | Wrong file format (not PDF/A) | Doc-control rejects; resubmit |
7 | Unclear signature or missing seal | Report invalid; full redo |
Case Study—Avoiding a $60 k Extension Fee
Deal: $8 M refinance on 52-unit Surrey rental
Issue: Competitor BCA lacked reliance letter & escalation factor—bank requested revision; seller faced $60 k rate-lock extension fee
Fix: ENGIPRO re-inspected key systems, issued compliant BCA in 5 days; loan funded on original schedule

How ENGIPRO Prevents Re-Submissions
ENGIPRO Advantage | Impact |
Bank-template cost tables | Matches CMHC / RBC column headers |
PDF/A output + DocuSign seal | Instant ingestion into lender portal |
24-hr underwriter Q&A | Questions resolved before credit-committee meetings |
Dual-credential team (P.Eng + CEng MICE) | Accepted by all BC and national lenders |
ASTM E2018-24 Standard Guide—basis for ENGIPRO BCA checklists.

FAQ—BCA & Bank Deadlines
Q | A |
Can I reuse a 2-year-old BCA? | Most lenders require <12 months; CMHC <6 months. |
Do I need intrusive testing? | Only if structural concerns arise. |
Can the report be stamped by an out-of-province engineer? | No—lenders and municipalities require BC-registered P.Eng. |
Why ENGIPRO for Rush BCAs?
Speed: 7-day standard, 5-day lightning
Coverage: Metro Vancouver, Fraser Valley, Vancouver Island, Okanagan
Value: Sealed reports by dual-certified engineers, with lender-ready formatting

Engage ENGIPRO Today
Fast. 5-, 7-, 10-day guarantees
Professional. Multi-licensed engineers, ASTM & lender templates
Friendly & Responsive. Project manager replies within 5 hours
Call 778-300-3935 or try our Instant Quote Tool—tick every lender box and close on time.
Secure your funding—on schedule—every time!